ATTENTION:<\/strong><\/p>\n\n\n\n BEFORE YOU READ THE ABSTRACT OR CHAPTER ONE OF THE PROJECT TOPICS BELOW, PLEASE READ THE INFORMATION BELOW.THANK YOU!<\/strong><\/p>\n\n\n\n INFORMATION:<\/strong><\/p>\n\n\n\n YOU CAN GET THE COMPLETE PROJECT OF THE TOPIC BELOW. THE FULL PROJECT COST N5,000 ONLY. THE FULL INFORMATION ON HOW TO PAY AND GET THE COMPLETE PROJECT IS AT THE BOTTOM OF THIS PAGE. OR<\/strong><\/p>\n\n\n\n YOU CAN CALL: 08068231953, 08137701720<\/strong><\/p>\n\n\n\n WHATSAPP US ON: 08137701720<\/strong><\/p>\n\n\n\n QUALITY, ACCEPTABILITY AND MICROBIAL COMPOSITION OF ENSILED BREWERIES SPENT GRAINS WITH YAM PEELS<\/strong><\/p>\n\n\n\n TABLE CONTENTS<\/p>\n\n\n\n Approval page<\/p>\n\n\n\n Dedication<\/p>\n\n\n\n Abstract<\/p>\n\n\n\n Acknowledgement<\/p>\n\n\n\n Table of content<\/p>\n\n\n\n CHAPTER ONE<\/p>\n\n\n\n INTRODUCTION<\/p>\n\n\n\n 1.1 Relevance of project<\/p>\n\n\n\n 1.2 Site inspection<\/p>\n\n\n\n 1.3 Evolution of road network in nigeria<\/p>\n\n\n\n 1.4 Motor vehicle characteristic that affects road design data<\/p>\n\n\n\n 1.5 Drivers and their characteristics<\/p>\n\n\n\n 1.6 Reconnaissance survey<\/p>\n\n\n\n 1.6.1Chain survey<\/p>\n\n\n\n 1.6.2Station marking<\/p>\n\n\n\n 1.7 Factors Affecting Choice Of Station<\/p>\n\n\n\n CHAPTER TWO<\/p>\n\n\n\n THEODOLITE TRANSVERSING OF THE ROAD CONTROL<\/p>\n\n\n\n 2.1 Definitions<\/p>\n\n\n\n 2.2 Thetheodolite<\/p>\n\n\n\n 2.3 Theodorite adjustment<\/p>\n\n\n\n 2.3.1Temporary adjustment<\/p>\n\n\n\n 2.3.2Permanent adjustment<\/p>\n\n\n\n 2.4 Procedure for theodolite traversing<\/p>\n\n\n\n 2.5Materials used for the theodolte traversinging<\/p>\n\n\n\n CHAPTER THREE<\/p>\n\n\n\n PROJECT FIELD LEVELING WORK<\/p>\n\n\n\n 3.1 Leveling<\/p>\n\n\n\n 3.2 Profile leveling<\/p>\n\n\n\n 3.3 Cross leveling<\/p>\n\n\n\n 3.4 Objectives of leveling<\/p>\n\n\n\n 3.5 Instruments used in leveling<\/p>\n\n\n\n 3.6 Temporary adjustment of leveling instrument<\/p>\n\n\n\n 3.7 Definition of some leveling terminologies<\/p>\n\n\n\n 3.8 Leveling book<\/p>\n\n\n\n 3.9 Earthwork computation<\/p>\n\n\n\n 3.9.1Method<\/p>\n\n\n\n CHAPTER FOUR<\/p>\n\n\n\n SOIL ANALYSIS<\/p>\n\n\n\n 4.1 Collection and preliminary preparation of samples<\/p>\n\n\n\n 4.2 Mechanical analysis<\/p>\n\n\n\n 4.3 Atterberg\/consistency limit tests<\/p>\n\n\n\n 4.3.1Liquid limit test<\/p>\n\n\n\n 4.3.2Plastic limit test<\/p>\n\n\n\n 4.4 Compaction test<\/p>\n\n\n\n 4.5 The California bearing ratio (cbr) test<\/p>\n\n\n\n 4.6 Pavement design using cbr<\/p>\n\n\n\n CHAPTER FIVE<\/p>\n\n\n\n GEOMETRIC ELEMENTS DESIGN<\/p>\n\n\n\n 5.1 Basic design parameters<\/p>\n\n\n\n 5.1.1Design speed<\/p>\n\n\n\n 5.1.2Gradient<\/p>\n\n\n\n 5.1.3Sight distance<\/p>\n\n\n\n 5.2 Curve design<\/p>\n\n\n\n 5.3 Curve parameters and formula used, in designing of horizontal curves<\/p>\n\n\n\n 5.4 Vertical curve design<\/p>\n\n\n\n 5.5 Cross sectional elements of the road<\/p>\n\n\n\n 5.6 Brief description on stages of work and equipment used n road constriction<\/p>\n\n\n\n 5.7 Summary and conclusion<\/p>\n\n\n\n Bibliography<\/p>\n\n\n\n HOW TO RECEIVE PROJECT MATERICAL(S)<\/strong><\/p>\n\n\n\n After paying the appropriate amount (#5,000) into our bank Account below, send the following information to<\/strong><\/p>\n\n\n\n 08068231953 or 08168759420<\/strong><\/p>\n\n\n\n (1) Your project topics<\/p>\n\n\n\n (2) Email Address<\/p>\n\n\n\n (3) Payment Name<\/p>\n\n\n\n (4) Teller Number<\/p>\n\n\n\n We will send your material(s) after we receive bank alert<\/p>\n\n\n\n BANK ACCOUNTS<\/strong><\/p>\n\n\n\n Account Name: AMUTAH DANIEL CHUKWUDI<\/p>\n\n\n\n Account Number: 0046579864<\/p>\n\n\n\n Bank: GTBank.<\/p>\n\n\n\n OR<\/p>\n\n\n\n Account Name: AMUTAH DANIEL CHUKWUDI<\/p>\n\n\n\n Account Number: 3139283609<\/p>\n\n\n\n Bank: FIRST BANK<\/p>\n\n\n\n FOR MORE INFORMATION, CALL:<\/strong><\/p>\n\n\n\n 08068231953 or 08168759420<\/strong><\/p>\n\n\n\n AFFILIATE LINKS:<\/a><\/p>\n\n\n\n easyprojectmaterials.com<\/a><\/p>\n\n\n\n